- Color & Coating
- Environmental Testing Systems
- Temperature Humidity Chamber
- Ozone , Dust , Rain & Noxious Gas Chamber
- Accelerated Weathering Test Chamber
- Salt Spray Test Chamber
- Drying Oven
- Digital Thermometer
- Digital Temperature & Humidity Meter
- Infrared Thermometer
- Moisture Meter
- Anemometer
- Light Meter
- Sound Level Meter
- Particle Counter
- Vibration Machine
- Gas Detector
- Heater
- Others
- View All
- Material Testing
- Universal Testing Machine
- Charpy Pendulum Impact Tester
- BenchTop Hardness Tester
- Ultrasonic Thickness Gauge
- Portable Hardness Tester
- Shore Rubber & Plastic Hardness Tester
- Surface Roughness Tester
- Ultrasonic Flaw Detector
- Melt Flow Rate Meter (MFI)
- Sample Preparation Machine
- Asphalt & Bitument Testing
- Heat Stress Metter
- Plastic Testing Equipment
- Precise Measurement Solution Provider
- Rheometer
- View All
- Metrology Measuring System
- Portable Measuring & Testing Instruments
- Vibration Meter
- Push Pull Gauge
- Data Logger / Data Logging Instrument
- Digital Tachometer
- Digital Handheld Stroboscope
- Laser Range & Angle Finder
- Laser Distance Meter
- Gauss Meter
- Inspection Mirror
- Welding Gauge
- Adhesion Tester
- Cable Length Measuring Device
- Refractometer
- Rotating Analysis
- TDS
- View All
- Weighing & Metal Detection System
- Electronic & Electrical Testing Equipments
- Lab & Scientific Equipments
- Equipments for Food & Beverage Packaging
- Hot Wire Bottle Cutter
- Vacuum Leak Tester
- Pressure or Vacuum Gauge
- Secure Seal Analyzer
- CO2 Easy / CO2 Easy-DCO2 Measuring Device
- Burn Test
- Can And End Testing Equipments
- CO2 Measure
- Crown Cap Measure & Test
- Cutting Packaging
- Dimensional Measure
- Filtering
- Force Measure/Compresion/Dynamometers
- Stress Aplication
- Torque Measure
- Others
- View All
- Electric Vehicle Equipment
- Ion Fan
- Microscope
- Service Maintenance & Calibration
- Others
Redmark Industry Sdn Bhd
141-2, Jalan Radin Bagus, Bandar Baru Sri Petaling, 57000 Kuala Lumpur, Malaysia.
+603-9054 6939
+6012-499 2103
+6012-499 2103
Redmark Industry (Penang)
Sdn Bhd
7206, Mez Floor, Kompleks Perniagaan Pangsapuri Seri Cemerlang, Jalan Kampung Paya, Kampung Paya, 12200 Butterworth, Penang, Malaysia.
+6013-399 2103
sales@redmarkindustry.comchuin@redmarkindustry.com
(SAE J2464) Test Standard Should Be Perform
Previous | 12 / 14 | Next |
SAE J2464 Test Standard Should Be Perform (EV Electric Vehicle Battery)
Electric and Hyrid Electric Vehicle Rechargeable Energy Storage System (RESS) Safety and Abuse Testing.a) Immersion Test (Module or Pack Level)
Test Description
With the DUT in its normal operating orientation and at full state of charge, immerse the DUT in ambient temperature salt water (5% by weight NaCI in2 H) for minimum of 2 h or untill any visible reactions have stopped. the water depth must be enough to cmpletely submerge the DUT. The DUT may be placed into a tank filled with water or may be placed in a empty tank and water pumped into the tank to fully submerge the DUT.
Measured Data
The following data shall be collected as part of this test :
1. The temperature of the DUT to be recorded as function of time (temperature)
2. Voltage and resistance of the DUT to be recorded as a function of time (voltage and Resistance)
3.Video monitoring for the duration of the test, including the observation after the test as well as photographs of the setup and the DUT, before and after the test, including the post-test observation period. (PHOTOGRAPHS and VIDEO)
4.Gas analysis to measure potential gases produced by electrolysis of salt water (e.g Hydrogen or chlorine gas)
b) Thermal Shock Cycling (Cell Level or Above)
Test Description
With the DUT at the maximum operating state of charge, contained in a closed volume and active thermal controls ( primary and secondary) disabled, thermally cycle the DUT with ambient air cycling between 70'c to -40'c. The time for the chamber ambient temperature to reach each temperature extreme shall be 15 min or less, this test may be performed either through the use of a fast-response chamber or by moving test articles between two chambers at the two test temperatures. The DUT shall remain at each extreme for minimum of 1 h at the cell level, 6h at module level, or as required to reach a uniform temperature (+5'C) at the park level. A total of five cycles shall be performed. After thermal cycling, inspect the DUT for any damage, paying special attention to any damage, paying special attention to any seals that may exist. Also, determine whether control circultry, if any, is operational. Perform three C/3 discharge cycles at 25'c ambient air temperature before and after test (using the manufacturers recharge algorithm) to determine immediate effects of the thermal cycling.